Practical guide · Free PDF

Extend SAP with secure no-code vibe-coding

How to build SAP-connected business applications in just a few hours – with no ABAP code, without modifying the SAP core, and with governance and security that meet the requirements of industrial IT departments.

SAP S/4HANA SAP ECC No-code IT Security Sovereignty Confined AI
10× Faster than ABAP
0 Changes to the SAP core
Day 1 First connected prototype
Free

Download the SAP Vibe-code guide

Instant access after submission · PDF · 15 pages

Instant download after submission
Protected data · GDPR compliant
PDF · 15 pages · Permanent access

Who is it for?

This guide is for teams
that want to extend SAP without an ABAP project

🏛️

CIO / IT Manager

Govern SAP extensions within a secure, sovereign and auditable framework. No shadow IT, no ABAP technical debt.

🔧

Maintenance Manager

Build your custom SAP PM field interface without waiting for the next IT cycle. Work orders, offline, mobility.

🏭

Production Director

Run your short-interval management (SIM), TOP 5 / TOP 15 and Obeya with real-time SAP CO/PP data on the shop-floor big screen.

📦

Supply Chain Manager

Mobile goods receipts, field WMS, order tracking connected to SAP EWM. Without modifying the SAP core.

Quality / HSE Manager

Field audits, QHSE forms connected to SAP QM, real-time non-conformity alerts. ISO 9001 compliant.

Content overview

What you’ll learn

How Vision connects to SAP without modifying it

OData v2/v4, RFC/BAPI, standard SAP APIs. Data stays in SAP – Vision is the access layer. S/4HANA clean-core compatible.

SSO, RBAC, audit trail and confined AI

AI generates the application from the business description, never from SAP data. In production, zero active AI component. NIS2 compliant.

Scaleway France hosting or on-premise

No US Cloud Act. Single-tenant instance or full deployment on your own infrastructure. ANSSI SecNumCloud.

Delegation to business teams under IT control

Business leads build their apps. IT validates before every production release. Centralized catalog, mandatory promotion workflow.

5 concrete cases: CMMS, SIM, Obeya, QHSE, WMS

Mobile CMMS on SAP PM, SIM TOP 5 / TOP 15 meetings, multi-source Obeya, HSE audits on SAP QM, logistics on SAP EWM. With measured results.

Comparison table vs ABAP, SAP Build, vertical solution

Time, cost, clean core, sovereignty, confined AI, post-delivery changes: every IT decision criterion reviewed.

Ready to get started?

Download the guide for free

Your team’s next SAP application might be generated in just a few hours by your own business lead.

Download the SAP Vibecode guide